Catchpit Standard Drawing. Revision signature date civil engineering and development department 1. Where possible catchpits shall be located so as to reduce the flow of stormwater in the channel at pedestrian crossing points.
Standard Drawings All Documents. Standard Drawing 519A Drainage Catchpits group CP1 Precast concrete catchpits Author. Embedment depth at 250 max.
This will generally be at low points.
Standard Catchpit Details Sheet 5 of 5 415KB C 24061. Division 02 - Earthwork. Division 04 - Major Structures. All the drawings are not drawn to scale.